Step 2 Connect the other end of the network cable to the COM port on the ECC800-Pro
collector or the UIM20A expansion module.
----End

4.3.7.2 Connecting the NetCol8000 Monitoring Cable

Prerequisites
A network cable used for monitoring is prepared.
Context
Issue 02 (2021-05-12)
Default Value
OFF
ON
ON
OFF
ON
OFF
ON
When NetCol8000-C070/C150, NetCol8000-A050/A060/A100/A120, or
FusionCol8000-E220/E240/E400/C080/C210 connects to the NetEco over
Modbus RTU, connect cables by referring to this section.
The following figure shows the pin sequence of the network cable.
Figure 4-45 Pin sequence of a network cable
Copyright © Huawei Technologies Co., Ltd.
4 Connecting Monitoring Cables to Devices
Operations
Remaining in OFF
Remaining in ON
Remaining in ON
Remaining in OFF
Remaining in ON
● Not in teamwork mode: Remaining in OFF
● In teamwork mode: Set toggle switch 7 on the
main control boards of the first and last smart
cooling products to ON, and toggle switch 7
on the main control boards of the other smart
cooling products to OFF.
Remaining in ON
124