FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Figure 4-40 Removing a memory module
Step 10 Place the removed memory module in a memory box.
Step 11 Install memory modules.
----End
4.3.16 Installing a Memory Module
Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Remove the air duct.
For details, see
Step 6 Check whether a PCIe card is installed.
l
l
Step 7 Remove the PCIe card.
Issue 06 (2019-08-10)
NOTE
Perform this operation only when a memory module is not installed immediately.
3.1 Power-Off
3.3 Removing a CH121
3.5 Removing the
3.7 Removing the Air
If yes, go to
Step
7.
If no, go to
Step
8.
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
Cover.
Ducts.
4 Parts Replacement
87