Figure 3-77 Marking mounting holes (unit: mm)
Step 3 Install the baseplate, as shown by (3) in
Step 4 Route the cable of the card reader with a keypad through the cable hole in the
baseplate, as shown by (4) in
The card reader with a keypad is connected to the access actuator by a network cable.
Step 5 Check that cables are correctly connected.
Step 6 Secure the card reader with a keypad to the baseplate, as shown by (5) and (6) in
Figure
Figure 3-78 Installing a card reader with a keypad
----End