2.1 Unpacking and Acceptance

Unpack and inspect all cabinets, mechanical parts, and components. Check that all
the items are intact and comply with the packing list on the presence of both the
project supervisor and customer.
Procedure
Step 1 Unpack the carton labeled Contain Packing List and take out the
Step 2 Check all items against the
Step 3 If shortage or miscarriage occurs, fill in the
Report .
Step 4 If cargo damage occurs, fill in the
Step 5 Sign on the
are delivered.
Step 6 Store the items properly.
----End
Follow-up Procedure
Put the items to be installed immediately onto an ESD surface, such as a
polyethylene (PE) bag or an expandable polyethylene (EPE) foam. Pack the items
not to be installed immediately with their original packing materials. Put them in
a dry and cool environment without exposure to sunlight or electromagnetic
radiation.

2.2 Tools and Instruments

Before the installation, prepare the following common tools and transportation
tools. Tools required vary with the actual installation scenarios.
Issue 02 (2021-05-12)
2

Installation Preparations

Packing List .
Packing List with the customer after verifying that all required items
Copyright © Huawei Technologies Co., Ltd.
Cargo Shortage and Miscarriage
Cargo Replacement Application Form .
2 Installation Preparations
Packing List .