Checking The Installation; Checking The Installation Of The Cabinet - Huawei iMaster NetEco V600R021C10 Device Installation And Commissioning Manual

Table of Contents

Advertisement

iMaster NetEco
Device Installation and Commissioning Guide (Data
Center)

5.1 Checking the Installation of the Cabinet

SN
1
2
3
4
5
6
7
8
Issue 02 (2021-05-12)
5

Checking the Installation

Check Item
The cabinet is placed as designed.
The rack is secure and reliable and meets the anti-seismic requirements.
The horizontal and vertical differences do not exceed 3 mm. You can use
a horizontal ruler and a lead ruler to measure the differences.
If the cabinet is placed on an ESD floor, all the expansion bolts of the
supports are secure with the floor; the installation sequence of the
insulation washers, flat washers, spring washers, and nuts (bolts) are
correct; the installation holes of the supports are secure with the
expansion bolts. The supports are insulated from the floor and guide
rails. The resistance of all the insulated points between the supports and
cabinets measured by the MΩ level of the multimeter is greater than 5
MΩ.
All the screws are secure; a flat washer and a spring washer are installed
for each screw; the washers are properly placed.
The cabinets are arranged in order. The cabinet queue at both sides of
the passage is straight, and the difference does not exceed 5 mm.
The connecting plates are installed properly when two cabinets are
deployed on one site.
The front, side, and rear doors of the cabinets are installed. The front and
rear doors can be opened and closed. The door locks function normally.
The exteriors and interiors of the cabinets (including the front door, rear
door, and sides of each cabinet) are clean. No dirt, damage, or
fingerprint is allowed.