Issue 02 (2021-05-12)
Batt. String
Config
Current
acquisition source
Battery N line
Single batt. group
number of HALL
Single batt.
capacity
Batt. installation
time
iBAT number of
iBOX
Number of
battery strings
Batt. string No.
On the iBOX WebUI, choose System Settings > Running Parameter, and set
Running Parameter.
Figure 6-12 Running Parameter
Running
Parameter
Parallel
Communication
Configuration
Copyright © Huawei Technologies Co., Ltd.
Description
The actual specifications of the Hall effect sensor
prevail.
Set whether there is a battery N wire according to the
actual situation.
Indicates the number of Hall effect sensors connected
to a single battery string.
Specifies the capacity of each battery that is connected
in the battery string in series.
Time when the battery is installed for the first time.
Does not need to be reset when part of batteries are
replaced.
Indicates the total number of iBATs managed by the
iBOX.
Indicates the total number of battery strings managed
by the iBOX.
Sets the battery string numbers of the iBOXs connected
in parallel to unique ones when multiple iBOXs are
connected in parallel.
Description
There is no need to set this parameter for a single
iBOX. If multiple iBOXs are connected in parallel, set
iBOX parallel communication switch to Yes, set
Number of iBOX configured under each UPS, and set
the IP address for each iBOX.
6 Adding Devices