Maintenance Schedule - Teledyne T100 Instruction Manual

Uv fluorescence so2 analyzer
Hide thumbs Also See for T100:
Table of Contents

Advertisement

8.1. MAINTENANCE SCHEDULE

Table 8-1 is the recommended maintenance schedule for the T100. Please note that in certain environments with high levels of
dust, humidity or pollutant levels some maintenance procedures may need to be performed more often than shown.
ITEM
ACTION
Change particle
1
Particulate filter
filter
Review and
Verify test functions
evaluate
Evaluate offset
Zero/span check
and slope
Zero and span
1
Zero/span calibration
calibration
1
External zero air
Exchange
scrubber (optional)
chemical
1
Perform flow check
Check Flow
Internal IZS
Replace
Permeation Tube
Perform pneumatic
Verify Leak
Annually or after repairs
leak check
Tight
2
Pump diaphragm
Replace
Calibrate UV Lamp
Perform LAMP
Output
CAL
Low-level
3
PMT sensor
hardware
hardware calibration
calibration
Clean
1
Sample chamber
chamber,
optics
windows and
filters
1
Critical flow orifice &
Replace
sintered filters
1
These Items are required to maintain full warranty; all other items are strongly recommended.
2
A pump rebuild kit is available from Teledyne ML's Customer Service including all instructions and required parts (refer to Appendix B for part numbers).
3
Replace desiccant bags each time the inspection plate for the sensor assembly is removed.
Table 8-1: T100 Preventive Maintenance Schedule
CAL
MANUAL
FREQUENCY
CHECK
SECTION
Weekly
No
8.2; Appendix
Weekly
No
Weekly
--
6.3, 6.6, 6.9
6.2, 6.4, 6.5,
Every 3 months
--
6.7, 6.8
Every 3 months
No
Every 6 Months
No
Annually
YES
Yes
involving pneumatics
Refer to
Annually
Yes
diaphragm kit
instructions
Prior to zero/span
4.8.7 &
calibration or PMT
--
10.7.2.5
hardware calibration
On PMT/ preamp
changes if
Yes
10.7.2.8
0.7 < SLOPE or
SLOPE >1.3
10.7.2.2 &
As necessary
Yes
10.7.2.3
As necessary
Yes
8.3.1
C
8.3.3
8.3.7
8.3.2
8.3.6
8.3.4
211
DATE PERFORMED

Advertisement

Table of Contents
loading

Table of Contents