Maintenance Schedule; Table 9-1: M100E Preventive Maintenance Schedule - Teledyne 100E Instruction Manual

Uv fluorescence so2 analyzer
Table of Contents

Advertisement

Instrument Maintenance

9.1. Maintenance Schedule

Table 9-1 is the recommended maintenance schedule for the M100E. Please note that in
certain environments with high levels of dust, humidity or pollutant levels some
maintenance procedures may need to be performed more often than shown.

Table 9-1: M100E Preventive Maintenance Schedule

Item
Action
TEST
Review and
functions
evaluate
Evaluate
Zero/span
offset and
check
slope
Zero and
Zero/span
span
calibration
calibration
PMT Sensor
Low-level
Hardware
hardware
Calibration
calibration
Change
Particulate
particle
filter
filter
Check for
Pneumatic
leaks in
sub-system
gas flow
paths
Sample
Chamber
Clean
windows and
Filters
External zero
Exchange
air scrubber
chemical
(optional)
156
Frequency
Cal
Check ?
Weekly
No
Weekly
Yes
Every 3
Yes
months
On PMT or
preamp
Yes
changes
Weekly
No
Annually or
Yes on
after repairs
leaks, else
involving
no
pneumatics
As necessary
Yes
Every 3
No
months
Model 100E Instruction Manual
Manual
Section
Appendix
C
7.3, 7.6
7.2, 7.4,
7.5
11.6.3
9.3.1
11.5.1;
11.5.2
- -
9.3.3
Date Performed
045150102 Rev XB1

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents