Troubleshooting & Repair
286
1. Turn off the instrument power.
2. Open the top cover of the instrument:
Remove the set screw located in the top, center of the rear panel.
Remove the screws fastening the top cover to the unit (four per side).
Lift the cover straight up.
3. Disconnect the sensor module pneumatic lines (refer to Figure 10-6
Gas inlet line: 1/8" black Teflon line with stainless steel fitting.
Gas outlet line: 1/4" black Teflon
4. Disconnect all electrical wiring to the Sensor Module:
UV lamp power supply wiring
Shutter cabling
Reaction cell thermistor wiring (yellow)
Reaction cell heater wiring (red)
UV detector wiring
TEC power cable
PMT wiring (connectors J5 & J6 on the PMT preamplifier PCA)
5. Remove the three sensor module mounting screws.
Mounting
Screw
Figure 10-7:
Follow the above steps in reverse order to reinstall the sensor module.
Teledyne ML - T100 UV Fluorescence SO2 Analyzer
line with brass fitting.
Sample
Chamber
Sensor Module Mounting Screws
06807A(DCNxxxx)
Mounting
Screw
PMT
Housing
Mounting
Screw