Check Point (1/2) - NEC Univerge SV8500 Operation And Maintenance Manual

Hide thumbs Also See for Univerge SV8500:
Table of Contents

Advertisement

4.4.1

Check Point (1/2)

Confirm the data shown below when service features cannot be assigned or service cannot be operated:
(1) Confirm that line capacity of physical PIR and virtual PIR is set correctly.
(2) Confirm that value of ASYD command to display LP mounting status is assigned as below.
ASYD, SYS1, INDEX198=33
ASYD, SYS1, INDEX199=33
(3) Compare the status of "virtual PIR mounting information" with "physical/virtual PIR line capacity" dis-
played. Data is assigned as below in this system.
ASYD, SYS1, INDEX556=F0
ASYD, SYS1, INDEX557=FF
(4) Confirm that all units are properly mounted by using the AUNT command.
CHAPTER 5
Operation Procedure for System with PIR
– 617 –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp85-104 s1e

Table of Contents