Initialization Check

To determine if the system is initializing correctly, only the first
chassis, GCD-CP10, one GCD-8DLCA, and terminals should be
installed on the system. After initialization, all the terminals assigned
to the GCD-8DLCA can be used for internal calls to one another. (By
default, these stations are assigned station numbers 101~108).

System Initialization

Before initialization is performed and verified, the entire system should be
initialized.
With power OFF, all interface and option cards can be installed in the
controlling chassis. The technician can then power up the system to perform
a First Initialization. After the initialization, each station display shows default
time and date indications.
For example:
12-2 Fri 10:47 AM

After Initialization

Ensure that the battery is installed in CN15 on the
GCD-CP10.
Check all blade slots in software to ensure the initialization process scanned
the installed hardware correctly.
A general system operation check should be performed using default values
prior to system programming.
After all previous steps are performed and any problems corrected, system
programming is complete.
After System Programming is finished, the technician should perform a
Second Initialization. Performing the First Initialization a second time causes
all programming memory to be lost. Second Initialization refreshes the system
RAM without losing any memory.
This completes the installation procedure for the UNIVERGE SV9100 system.
The technician should check the operation of each Multiline Terminal to
ensure the system is working properly.