Siemens G130 List Manual page 1314

Hide thumbs Also See for G130:
Table of Contents

Advertisement

[8732] From sequencer
[8732] From sequencer
[8732] From sequencer
[8732] From sequencer
[8732] From sequencer
Bit 9 = 1 --> Ready to exchange process data
[8750] From power unit
[8738.4] From line contactor control
<1> The drive object is ready to accept data.
<2> Only for S120 and G150.
1
2
DO: B_INF
Basic Infeed - Status word, sequence control, infeed
Bit No.
Status word sequence control infeed
0
1 = Ready for switching on
1
1 = Ready for operation
2
1 = Operation enabled
3
Reserved
4
1 = No OFF2 active
5
Reserved
6
1 = Switching on inhibited
7
Reserved
8
Reserved
9
1 = Control requested
10
Reserved
11
1 = Precharging completed
12
1 = Line contactor closed
13
Reserved
14
Reserved
15
Reserved
3
4
<1>
5
6
Function diagram
fp_8726_54_eng.vsd
S120/S150/G130/G150
19.06.15 V04.08.00
p0115[3] (2000.00 μs)
<2>
ZSW sequence ctrl
r0899
r0899.0
r0899.1
r0899.2
r0899.4
r0899.6
r0899.9
r0899.11
[8760.5]
r0899.12
7
8
- 8726 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

SinamicsG150

Table of Contents