25
Measure Commands
:MEASure:NPERiod
Command
:MEASure:NPERiod <source>, <slope>, <N>
The :MEASure:NPERiod command measures the span of time of N
consecutive periods. The measurement then moves over one period and
measures the span of time of the next N consecutive periods.
<source>
the source on which the measurement is made
<slope>
rising or falling
<N>
An integer greater than or equal to 1.
Example
This example measures the time span of 3 consecutive periods on channel
1 (rising edge).
myScope.WriteString ":MEASURE:NPERiod CHAN1, rising, 3"
Query
:MEASure:NPERiod?
Agilent Infiniium 90000 Series Oscilloscopes Programmer's Reference
591