ABB IRB 7600 Product Manual page 339

Hide thumbs Also See for IRB 7600:
Table of Contents

Advertisement

11
12
13
14
15
16
17
18
Product manual - IRB 7600
3HAC022033-001 Revision: AH
Action
Refit the bottom plate underneath the robot
base by pushing it into the groove and fitting
the attachment screw.
If removed, also refit the rear connector plate.
Note
Direct the bends on the bottom plate down-
wards!
CAUTION
The base and axis 1 gearbox weighs 310 kg
+ 200 Kg.
All lifting accessories used must be sized ac-
cordingly!
Lift the robot base and gearbox 1 and remove
the base and gear support.
Secure the base to the mounting site.
Refit the complete arm system.
CAUTION
This is a complex task to be performed with
utmost care in order to avoid injury or dam-
age!
Perform a leak-down test.
Refill the gearbox with oil.
Recalibrate the robot.
© Copyright 2007 - 2023 ABB. All rights reserved.
4.7.1 Replacing the axis 1 gearbox
Note
1 screw: M6 x 8.
xx0300000612
A: Bottom plate
B: Rear connector plate
C: Attachment screw
D: Groove
See
Orienting and securing the robot
on page
79.
Detailed in section
Replacing the axis
1 gearbox on page
329.
See section
Performing a leak-down
test on page
206.
See
Changing oil, axis-1 gearbox on
page
164.
Pendulum Calibration is described in
Operating manual - Calibration Pendu-
lum, enclosed with the calibration tools.
Axis Calibration is described in
ing with Axis Calibration method on
page
389.
General calibration information is in-
cluded in section
Calibration on
page
375.
Continues on next page
4 Repair
Continued
Calibrat-
339

Advertisement

Table of Contents
loading

Table of Contents