ABB IRB 7600 Product Manual page 331

Hide thumbs Also See for IRB 7600:
Table of Contents

Advertisement

Removal, gearbox axis 1
Use this procedure to remove gearbox, axis 1.
1
2
3
4
5
6
Product manual - IRB 7600
3HAC022033-001 Revision: AH
Action
If the robot is to be calibrated with fine
calibration:
Remove all external cable packages
(DressPack) and tools from the robot.
Action
Decide which calibration routine to use, and
take actions accordingly prior to beginning
the repair procedure.
Move the robot to its most stable position,
shown in the figure to the right.
DANGER
Turn off all:
electric power supply
hydraulic pressure supply
air pressure supply
to the robot, before entering the robot
working area.
Drain the axis 1 gearbox.
Remove the complete arm system.
Unfasten the robot base from the foundation
by removing the base attachment screws.
© Copyright 2007 - 2023 ABB. All rights reserved.
4.7.1 Replacing the axis 1 gearbox
Note
Note
xx0300000022
See
Changing oil, axis-1 gearbox on
page
164.
Detailed in section
Replacement of com-
plete arm system on page
Continues on next page
4 Repair
Continued
228.
331

Advertisement

Table of Contents
loading

Table of Contents