UPS2000-A-(6 kVA-10 kVA)
User Manual (App)
Figure 4-14 Installing battery cables (four battery packs)
----End

4.4 Checking the Installation

Table 4-4 Installation checklist
No.
1
2
Issue 02 (2024-01-30)
NO TE
It is recommended that switches be installed for battery cables. Customers need to
purchase switches by themselves. For details about the battery circuit breaker specifications,
see
4.1.4 Power
Cables.
Item
Cable routing
Cable connections
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
Expected Result
Cables are routed properly according
to engineering requirements.
All cables are tightened to specified
torques using a torque wrench,
connected correctly, and free of
damage.