Chapter 7 Checking Hardware Installation; About This Chapter; Checking Bbu3806 Installation; Table 7-1 Check Items For Bbu3806 Installation - Huawei BBU3806 Installation Manual

Wcdma base band unit
Table of Contents

Advertisement

Installation Manual – Hardware Installation
BBU3806 WCDMA Base Band Unit

Chapter 7 Checking Hardware Installation

7.1 About This Chapter

This chapter describes the checkup work after the installation of BBU3806 as follows:

Checking BBU3806 Installation

Checking Cable Installation
Power-on Check
Checking Equipment Room
Note:
Install BTS3806 by complying with related engineering requirements and technical
specifications.
Check the result of each step to solve problems as early as possible.
Never leave unsolved problems until project acceptance.
7.2 Checking BBU3806 Installation
Table 7-1 lists the check items for BBU3806 installation.

Table 7-1 Check items for BBU3806 installation

Serial No.
1
2
3
4
BBU3806 is in secure and reliable connections with the bases. The
installed BBU3806 stands still.
The horizontal error of a surface-mounted BBU3806 is less than 3
mm and the vertical one no more than 3 mm.
All screws securing BBU3806 are fastened. The flat washers and
spring washers are mounted as required.
The BBU3806 surface is clean and neat. The external paint is
satisfactory. All labels, tags, and nameplates are correct, legible, and
complete.
Huawei Technologies Proprietary
7-1
Chapter 7 Checking Hardware Installation
Check item

Advertisement

Table of Contents
loading

Table of Contents