Figure 5-2: Exploded View Of Adf Unit Packaging - Pacific Power Source ADF Series Operation Manual

Table of Contents

Advertisement

ADF SERIES® OPERATION MANUAL
SECTION 5: UNPACKING AND INSTALLATION
Hand Grip Openings

Figure 5-2: Exploded view of ADF unit packaging

If the unit is to be installed in an instrument rack, the straps may be removed. In that case, a
suitable lift must be used to position the unit at the desired rack height and pushed in place
using either rack slides or L-brackets (not included with the unit). The front panel handles
may be used to pull or push the unit in or out of a rack space only.
Note: The front panel handles are not designed to carry the entire unit. It must be
supported on front and back or both sides by two persons when being handled.
Entire Contents Copyright
2018 by Pacific Power Source, Inc. (PPS) • All Rights Reserved • No reproduction without written authorization from PPS.
ADF Series Power Source Operation Manual
Page 40 of 349

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADF Series and is the answer not in the manual?

Questions and answers

Table of Contents