Boards - Juniper QFX10016 Hardware Manual

Hide thumbs Also See for QFX10016:
Table of Contents

Advertisement

Related
Documentation
Unpacking QFX10000 Line Cards, Control Boards, and Switch Interface Boards
Copyright © 2017, Juniper Networks, Inc.
Mounting a QFX10016 in a Four-Post Rack Using a Mechanical Lift on page 153
Orders for line cards, additional Control Boards, and SIB components are FRUs that are
shipped separately from the switch chassis. The housing for the Control Boards and line
cards are rigid sheet-metal structures that house the electronics. SIBs have an exposed
printed circuit board on one side and sheet metal on the other. All these components are
shipped in a cardboard carton, secured with packing material.
CAUTION:
The components are maximally protected inside the shipping
carton. Do not unpack them until you are ready to install the components in
the switch chassis.
Before you unpack a component:
Ensure that you have taken the necessary precautions to prevent electrostatic discharge
(ESD) damage. See
"Prevention of Electrostatic Discharge Damage" on page
Ensure that you know how to handle and store the component. (See
Storing QFX10000 Line Cards, Control Boards, and SIBs" on page
To unpack a Control Board, SIB, or line card, (see
Move the shipping carton to a staging area as close to the installation site as possible.
1.
Position the carton so that the arrows are pointing up.
2.
Open the top flaps on the shipping carton.
3.
Pull out the packing material that holds the component in place.
4.
Remove the component from the electrostatic bag.
5.
Save the shipping carton and packing materials in case you need to move or ship the
6.
Control Board, SIB, or line card later.
Chapter 12: Unpacking and Mounting the Switch
"Handling and
213).
Figure 57 on page
146):
327.
145

Advertisement

Table of Contents
loading

Table of Contents