ABB REG650 Technical Manual page 318

Generator protection
Hide thumbs Also See for REG650:
Table of Contents

Advertisement

Section 11
Secondary system supervision
312
prolongs the presence of MCBOP signal to prevent the unwanted operation of voltage
dependent function due to non simultaneous closing of the main contacts of the
miniature circuit breaker.
The input signal 89b is supposed to be connected via a terminal binary input to the
N.C. auxiliary contact of the line disconnector. The 89b signal sets the output signal
BLKV in order to block the voltage related functions when the line disconnector is
open. The impedance protection function does not have to be affected since there will
be no line currents that can cause malfunction of the distance protection.
The output signals 3PH, BLKV and BLKZ as well as the signals DLD1PH and
DLD3PH from dead line detections are blocked if any of the following conditions occur:
The operation mode selector OpMode is set to Disabled
The input BLOCK is activated
The IED is in TEST status (TEST-ACTIVE is high) and the function has been
blocked from the HMI (BlockFUSE=Yes)
The input BLOCK is a general purpose blocking signal of the fuse failure supervision
function. It can be connected to a binary input of the IED in order to receive a block
command from external devices or can be software connected to other internal
functions of the IED. Through OR gate it can be connected to both binary inputs and
internal function outputs.
1MRK 502 043-UUS B
Technical Manual

Advertisement

Table of Contents
loading

Table of Contents