Avaya DEFINITY Server CSI Maintenance Manual page 842

Table of Contents

Advertisement

Maintenance Objects
BRI Set Audits Test (#630)
This is a series of two tests which are classified as audits. The switch sends
messages to the BRI endpoint to perform the following tests:
Ringer Audit - This audit ensures that both the switch and the endpoint
agree as to the current state of the endpoint's ringer.
Lamps Audit - This audit ensures that both the switch and the endpoint
agree as to the current state of the endpoint's lamps.
Call Activity Audit - This audit ensures that the state of calls is consistent
between the switch and the endpoint.
This test is not executed for ASAI or adjunct because adjuncts do not employ
ringers or lamps, or establish calls on the B-channels associated with the BRI
interface.
Table 129. TEST #630 BRI Set Audits
Error
Test
Code
Result
1113
ABORT
1139
ABORT
1141
ABORT
1144
ABORT
842
Issue 5 October 2002
Description/ Recommendation
The signaling link between the switch and the endpoint is down.
1. Use the test port PCSSpp long command to clear any errors which
prevent establishment of the signaling link.
2. Examine the results of the Signaling Link Status Test (#626) which is
run as part of this command. If this test aborts or fails, follow the repair
procedure for Test #626.
The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, use test port long PCSSpp and review the
results of the BRI Port Local LAN Loop Around Test to verify the repair.
The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, use test port long PCSSpp and review the
results of the BRI Port Local LAN Loop Around Test to verify the repair.
Continued on next page
555-233-119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents