Avaya DEFINITY Server CSI Maintenance Manual page 1315

Table of Contents

Advertisement

ISDN-TRK (DS1 ISDN Trunk)
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. By clearing error codes associated with the NPE Crosstalk
Test, for example, you may also clear errors generated from other tests in the
testing sequence.
Table 317. System Technician-Demanded Tests: ISDN-TRK
Order of Investigation
NPE Crosstalk Test (#6)
Conference Circuit Test (#7)
Audit and Update Test (#36)
Signaling Link State Check Test (#255)
Service State Audit Test (#256)
Call State Audit Test (#257)
ISDN Test Call Test (#258)
1.
D = Destructive, ND = Non-destructive
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port's NPE channel talks on the selected
time slot and never crosses over to time slots reserved for other connections. If
the NPE is not working correctly, one-way and noisy connections may be
observed. This test is usually only part of a port's Long Test Sequence and takes
about 20 to 30 seconds to complete.
NOTE:
The TN464C or later UDS1 circuit pack has one SCOTCH-NPE chip instead
of several NPE chips.
555-233-119
Short Test
Long Test
Sequence
Sequence
X
X
X
X
X
X
X
X
X
X
X
Continued on next page
Issue 5 October 2002
1
D/ND
ND
ND
ND
ND
ND
ND
ND
1315

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents