Avaya DEFINITY Server CSI Maintenance Manual page 814

Table of Contents

Advertisement

Maintenance Objects
Table 114. TEST #621 Level 1 Status Inquiry — Continued
Error
Test
Code
Result
2
FAIL
3
FAIL
4
FAIL
PASS
814
Issue 5 October 2002
Description/ Recommendation
For the TN556 or TN2208, received a status of Level 1 Pending
Activation-Endpoint Active which indicates a problem with the BRI endpoint
or ASAI or adjunct, the wiring to the endpoint or adjunct, or the ISDN-BRI
port.
For the TN2198, received a status of Level 1 Pending Activation. U
interface up S/T interface down, which indicates a problem with the NT1 or
the wiring between the NT1 and the BRI endpoint (S/T interface).
1. As necessary, check and repair the wiring between the circuit pack and
the endpoint or adjunct. Execute test port PCSSpp and review the
results of the Level 1 Status Inquiry test to verify the repair. If this test is
still fails, go to Step 2.
2. For BRI endpoints, try replacing the BRI endpoint(s) connected to the
port. For ASAI or adjuncts, follow the recommended repair procedures
of the manufacturer for link communication problems. For the NT1,
follow the recommended repair procedures of the manufacturer. Then
execute test port PCSSpp and review the results of the Level 1 Status
Inquiry test to verify repair.
Received a status of Level 1 Deactivated; the port is out-of-service.
1. Use status bri-port PCSSpp to verify that the service state of the port
is out-of-service. If the service state of the port is not out-of-service, go
to Step 2.
2. If the port has been placed out-of-service with busyout port PCSSpp,
try to release the port with release port PCSSpp. Then use test port
long PCSSpp, and review the results of Level 1 Status Inquiry test. If
this test is still fails, go to Step 3.
3. Use test port long PCSSpp and review the results of all the tests.
Follow the repair procedures for any tests that fail. Verify repair of the
problem with test port PCSSpp and by determining that the Level 1
Status test passes.
For the TN2198 only:
Received a status of Level 1 Pending Activation, the NT1 has a loss of
power indicating a problem with the NT1.
1. For the NT1 follow the manufacturers recommended repair procedures.
2. Use test port PCSSpp, and review the results of the Level 1 Status
Inquiry test to verify the repair.
This test indicates that Level 1 is activated, or that software has taken the
port out of service.
Continued on next page
555-233-119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents