Electronic Power Feed Inquiry - Avaya DEFINITY Server CSI Maintenance Manual

Table of Contents

Advertisement

BRI-PORT (ISDN-BRI Port), ABRI-PORT (ASAI
ISDN-BRI Port)

Electronic Power Feed Inquiry (#622)

This test queries the BRI-LINE circuit pack for the status of the Electronic Power
Feed (EPF) supplied to a BRI endpoint or an ASAI or adjunct. If the EPF is on and
no overcurrent condition exists, this test passes. All other states are not normal
and indicate a problem with the endpoint or adjunct, the wiring to the endpoint or
adjunct, or the BRI-LINE circuit pack. This test is not run on the TN2208 circuit
pack or the TN2198 and will always return a pass for a TN2198. The TN2208 has
no power feeds.
Table 115. TEST #622 Electronic Power Feed Inquiry
Error
Test
Code
Result
1005
ABORT
2000
ABORT
2012
ABORT
2100
ABORT
1
FAIL
2000
ABORT
PASS
555-233-119
Description/ Recommendation
This test is not valid for this port type. Ports on the TN2208 cannot run
this test because this board does not have an electronic power feed.
Response to the test was not received from the circuit pack within the
allowable time period.
1. If the test aborts repeatedly a maximum of 5 times, reset the circuit
pack with busyout board PCSS and reset board PCSS.
2. If the test aborts again, replace the circuit pack.
Internal system error.
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
The BRI-LINE circuit pack reports that it has detected an overcurrent
condition and has turned off the EPF.
1. As necessary, check and repair the wiring between the circuit pack
and the endpoint or adjunct. Check the endpoints and replace one
or both sets if the sets are drawing too much current. Use test port
PCSSpp and review the results of the EPF Inquiry Test to verify the
repair. If this test is still fails, go to Step 2.
2. Use test port PCSSpp, and review the results of the Level 1 Status
Inquiry Test. If this test is also failing, follow the repair procedure for
the Level 1 Status Inquiry Test.
Response to the test was not received from the circuit pack within the
allowable time period.
1. If the test aborts repeatedly a maximum of 5 times, reset the circuit
pack with busyout board PCSS and reset board PCSS.
2. If the test aborts again, replace the circuit pack.
The Electronic Power Feed Inquiry Test reports that the EPF is on.
Continued on next page
Issue 5 October 2002
815

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents