Procedures For Hp Personnel; Assembling Mounts; Shelf Mounts - HP M2350A Service Manual

Component central monitor
Table of Contents

Advertisement

Preparing the Site
Procedures for HP Personnel
Procedures
for HP Personnel
Before beginning the following procedures for assembling mounts and preparing cables, be sure
that the customer has completed all necessary preparations outlined in the previous section,
"Procedures for Local Staff. n
Assembling
Mounts
Each mount is delivered with a complete set of mounting hardware. Refer to the HPM1180
Series Wall and Ceiling Mount Equipment Note (Ml 180-90900) for additional instructions on
assembling mounts.
Warning
It is the customer's responsibility
to have the attachment
of the mounting
hardware to the ceiling, wall, or mounting rail and the construction
of
the ceiling, wall, or mounting rail evaluated for structural
integrity
and compliance with all local, state and any other required codes by a
registered,
professional,
structural
and/or mechanical engineer.
Ensure that this commitment
has
been met before assembling mounts.
Shelf Mounts
If shelf mounts are to be hung on rails, HP personnel are responsible for hanging and leveling
the shelf options onto the rails which are provided by the customer.
5.10

Advertisement

Table of Contents
loading

This manual is also suitable for:

M2360a

Table of Contents