Preparing the Site
Site Preparation
Responsibilities
Warning
It is the customer's responsibility
to have the attachment
of the mounting
hardware to the ceiling, wall, or mounting rail and the construction
of
the ceiling, wall, or mounting rail evaluated for structural
integrity
and compliance with all local, state and any other required codes by a
registered,
professional,
structural
and/or mechanical engineer.
Although
considerable
effort has been made to ensure the safety of
the ceiling mount installation
and or mounting guidelines, it is to be
understood that the installation
itself is beyond the control of BP.
Accordingly,
EIP will not be responsible for the failure of any such
installation.
Providing
Conduit
Where a remote installation is required, the customer is responsible for the following hardware
installations:
n
Providing conduit and/or trunking of a sufficient cross- sectional area for the planned cables
and possible future expansion (for additional components or systems),
n
Providing and/or installing suitable wall boxes to accommodate the faceplates.
Warning
NEVER run power cables through the same conduit or trunking
used for
HP Component CentraJ Monitor
cables.
5-3

Advertisement