TRANSFER SYSTEM
PRECAUTION
When working with FIPG material, you must observe the following:
S
Using a razor blade and gasket scraper, remove all the old packing (FIPG) material from gasket
surfaces.
S
Thoroughly clean all components to remove any loose material.
S
Clean both sealing surfaces with a non−residue solvent.
S
Apply FIPG in approx. a 1 mm (0.04 in.) wide bead along the sealing surface.
S
Parts must be assembled within 10 minutes of FIPG application. Otherwise, the packing materi-
al must be removed and reapplied.
TRANSFER
−
TRANSFER SYSTEM
TR−1
TR00V−03