CH−16
Turn
CHARGING (2UZ−FE)
−
INSTALLATION
1.
INSTALL GENERATOR
(a)
Install the generator with the bolt and nut.
Torque: 39 N·m (400 kgf·cm, 29 ft·lbf)
(b)
Connect the generator connector.
(c)
Connect the generator wire with the nut and rubber.
(d)
Install the terminal cap.
(e)
Install the wire clamp to the cord clip on the generator.
2.
INSTALL PS VANE PUMP (See page SR−69)
3.
INSTALL DRIVE BELT
Install the belt by turning the belt tensioner counterclockwise.
HINT:
The pulley bolt for the belt tensioner has a left−hand thread.
4.
CONNECT INTAKE AIR CONNECTOR TO THROTTLE
BODY
5.
PERFORM ON−VEHICLE INSPECTION
(See page CH−1)
6.
INSTALL THROTTLE BODY COVER
B00809
7.
INSTALL ENGINE UNDER COVER
8.
CONNECT CABLE TO NEGATIVE (−) BATTERY TER-
MINAL
GENERATOR (Standard Spec.)
CH0LQ−02