11. Raise the vehicle on the hoist to full height.
12. Remove the rope from the steering gearbox, and
install it on the subframe.
13. Tighten the power steering (P/S) hose clamp
mounting bolts (A), and install the harness clamp
(B).
B
10 x 1.25 mm
39 N·m
(4.0 kgf·m, 29 lbf·ft)
A
6 x 1.0 mm
12 N·m (1.2 kgf·m,
8.7 lbf·ft)
14. Install the stiffeners.
10 x 1.25 mm
58 N·m (5.9 kgf·m, 43 lbf·ft)
15. Tighten the P/S hose clamp mounting bolt (A), and
install the P/S hose in the clamps (B).
B
10 x 1.25 mm
59 N·m
(6.0 kgf·m,
43 lbf·ft)
A
6 x 1.0 mm
12 N·m
(1.2 kgf·m,
8.7 lbf·ft)
(cont'd)
5-15