Installation Preparations; Preparing Cables - Huawei MTS9300A Installation Manual

Hide thumbs Also See for MTS9300A:
Table of Contents

Advertisement

MTS9300A Telecom Power (Claro, Colombia,
MTS9304A-AM10A1)
Installation Guide

2.1 Preparing Cables

The cross-sectional area of a power cable depends on the current that will flow
through the cable and the voltage drop allowed for the cable.
The cable cross-sectional areas listed are for reference only.
Table 2-1 Preparing cables
Cable Type
Cabinet ground cable
AC input
Live wire L1
power cable
Live wire L2
(three-
phase)
Live wire L3
Neutral wire
AC input
Live wire L1
power cable
Live wire L2
(two-phase)
AC input
Live wire L1
power cable
Live wire L2
(three-
phase)
Live wire L3
AC input
Live wire L1
power cable
Neutral wire
(single-
phase)
DC output
-
power cable
Issue 01 (2021-05-30)
2

Installation Preparations

Maximum
Minimum Cross-
Current (A)
Sectional Area (mm
NA
16
18
25
18
25
18
25
NA
25
54
25
54
25
32
25
32
25
32
25
54
25
54
25
125
25
Copyright © Huawei Technologies Co., Ltd.
2 Installation Preparations
Maximum Cross-
2
)
Sectional Area (mm
25
50
50
50
35
50
50
50
50
50
50
35
35
2
)
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mts9304a-am10a1

Table of Contents