BIO RAD ZE5 User Manual page 210

Cell analyzer and everest software
Table of Contents

Advertisement

Chapter 7 Creating Experiments and Workspaces
The run list details appears in a separate window.
2.
Inspect each tube or well to verify that all settings are correct.
3.
Close the Run List Details window and then click the Next arrow to go to the Settings screen.
In the Settings screen, you can create plots for analysis and adjust instrument settings such as
thresholds and PMT voltages. You can also add experimental panels to a single plate or rack, if
needed.
208 | ZE5 Cell Analyzer and Everest Software

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZE5 and is the answer not in the manual?

Table of Contents

Save PDF