Chapter 2 Hardware Description
Power and Communication Connections
Power and communication connections are located on the back of the ZE5 Cell Analyzer.
The following features are located in this entry panel:
n
Power cord (black) — IEC-compliant AC power cord.
n
Ethernet cable (green) — connects the instrument to Ethernet port of the computer workstation.
Used for data transfer and software control of the instrument.
Caution: Be careful not to trip on the power cord or Ethernet cable when you walk
around the instrument.
n
Power switch — press the main power switch to turn on power to the system.
Caution: Do not use the main power switch to shut down the system. Shut down the
system using Everest™ Software. For more information, see
page
161.
This area of the instrument also contains optional connections for external DI water and external
waste. For more information, see
26 | ZE5 Cell Analyzer and Everest Software
Appendix C, Optional External DI Water and Waste
Shutting Down on
Ports.
Need help?
Do you have a question about the ZE5 and is the answer not in the manual?
Questions and answers