1. Installation
1
11. Attach the guides of the output tray
12. Attach the guide mylar
Power On
The folder unit must be switched on before the main machine.
1. Switch on the folder unit.
2. Switch on the main machine.
• The folder unit must be switched on first, so that the main machine will recognize the folder unit after
the main machine is powered on and starts its initialization procedure.
80
, ,
to the rear of the folder unit.
to the middle output tray guide.