Ricoh Neptune-P1 Service Manual page 24

Table of Contents

Advertisement

Setting the Machine on the Roll Feeder (B852)
1. Do not remove the shipping tape from the connectors [1] of the roll feeder [2]. This prevents damage
to the connectors when the main machine is put on top of the roll feeder.
• The main machine weighs 100 kg (220 lb.).
• There are two handles in recesses on each side of the main machine. To prevent injury or damage
to the main machine, always use these handles [3] to lift the main machine.
• Two or more service technicians are necessary to lift the main machine and set it on the roll
feeder.
2. Lift the main machine, and set its rubber feet [4] into the holes [5] on the top of the roll feeder.
• With one person at each end of the main machine, use the two handles on each end of the main
machine to lift it.
3. Make sure that you put the rubber feet of the main machine into the holes on top of the roll feeder.
4. Check the dehumidifier switch [6] of the roll feeder. Make sure that it is OFF. If it is ON, set it to OFF.
Main Machine Installation (G180)
1
23

Advertisement

Table of Contents
loading

Table of Contents