Step 4:
Use the Metering Explorer of BESTCOMSPlus to open the Control, Virtual Switches tree branch
(Figure 334). Using select-before-operate, perform the following steps to control a virtual switch.
Step 5:
Click the 43-1 button to select it. Login may be required. The On or Off indicator (current state)
will begin to flash.
If step 6 is not performed within 25 seconds of step 5, the indicator will
stop flashing and the 43-1 button will have to be selected again.
Step 6:
Click on the 43-1 button a second time to operate it. After clicking Yes, the On or Off indicator
(previous state) will stop flashing and the On or Off indicator (current/new state) will light.
Step 7:
Verify that OUT1 contact closes and remains closed.
Step 8:
Repeat steps 5 and 6 to change the state of the 43-1 switch to OFF. Verify that OUT1 contact
opens and remains open.
Step 9:
(Optional.) Repeat steps 1 through 8 for 43-2, 43-3, 43-4, and 43-5.
Step 10: (Optional.) Repeat steps 1 through 9 for settings group 1, 2, and 3.
Switch Mode
Step 1:
Change the 43-1 element mode to Switch.
Step 2:
Prepare to monitor the virtual switch operation. An ohmmeter or continuity tester can be used to
monitor the contact status of OUT1.
Virtual Control Switches (43) Test
Figure 333. BESTlogicPlus Settings
Figure 334. BESTCOMSPlus Virtual Switches Control Screen
Note
9424200994 Rev U
BE1-11g

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BE1-11g and is the answer not in the manual?

Table of Contents

Save PDF