Installing An Mx2010 Cb-Re - Juniper MX2010 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

LTC3880-XF2-1.5v-RAIL
LTC3880-XF2-1.5v-CH0
LTC3880-XF2-1.5v-CH1
LTC3880-XF2-1.0v-RAIL
LTC3880-XF2-1.0v-CH0
LTC3880-XF2-1.0v-CH1
LTC3880-XF1-1.5v-RAIL
LTC3880-XF1-1.5v-CH0
LTC3880-XF1-1.5v-CH1
LTC3880-XF1-1.0v-RAIL
LTC3880-XF1-1.0v-CH0
LTC3880-XF1-1.0v-CH1
LTC3880-XF0-1.5v-RAIL
LTC3880-XF0-1.5v-CH0
LTC3880-XF0-1.5v-CH1
LTC3880-XF0-1.0v-RAIL
LTC3880-XF0-1.0v-CH0
LTC3880-XF0-1.0v-CH1
LTC3880-3.3v-RAIL
LTC3880-3.3v-CH0
LTC3880-3.3v-CH1

Installing an MX2010 CB-RE

To install a CB-RE
(seeFigure 185 on page
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
2. Remove the CB-RE from the electrostatic bag.
3. Carefully align the sides of the CB-RE with the guides inside the chassis.
4. Slide the CB-RE into the chassis until you feel resistance, carefully ensuring that it is correctly aligned.
5. Grasp both ejector handles, and gently close them inward simultaneously until the CB-RE is fully seated.
6. Check the LEDs on the CB-RE faceplate to verify that it is functioning normally.
The green OK/FAIL LED should light steadily a few minutes after the CB-RE is installed.
1500 mV
1500 mV
1501 mV
1029 mV
1029 mV
1032 mV
1499 mV
1499 mV
1500 mV
1029 mV
1029 mV
1032 mV
1499 mV
1499 mV
1501 mV
1029 mV
1029 mV
1033 mV
3300 mV
3300 mV
3300 mV
403):
401

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents