Reinstalling Components in the MX2010 Router After Initially Installing the Router in a Rack | 275
Tools Required to Install the MX2010 Router Using a Router Transport Kit
To install the router by using a router transport kit, you need the following tools and equipment:
Router transport kit (model number MX2K-TRNSPRT-KIT)
Front component shipping cover
Rear component shipping cover
Phillips (+) screwdrivers, numbers 1, 2, and 3
1/2-in. (12.7 mm) drive ratchet
1/4-in. (6.35 mm) torque-controlled driver or socket wrench to tighten the nuts on the router transport
kit
1-1/8-in. (28.57 mm) torque-controlled driver or socket wrench to tighten the router transport kit winch
mechanism
9/16-in. or 14-mm open-end or socket wrench with extension to remove bracket bolts from the shipping
pallet
Electrostatic discharge wrist strap
Antistatic mat
RELATED DOCUMENTATION
Overview of Preparing the Site for the MX2010 Router | 125
Installing the MX2010 Router Using a Pallet Jack with Attachment | 253
Reinstalling Components in the MX2010 Router After Initially Installing the Router in a Rack | 275
Tools and Parts Required to Maintain the MX2010 Hardware Components
To maintain hardware components, you need the following tools and parts:
ESD grounding wrist strap
Flat-blade (–) screwdriver
Phillips (+) screwdriver, number 1 and number 2
218