Installing An Mx2000 Router Dc Power Distribution Module (240 V China) - Juniper MX2010 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

Figure 165: Installing an MX2008 Router Power Distribution Module
8. Tighten both captive screws on the PDM. Apply between 10 lb-in. (1.13 Nm) to 12 lb-in. (1.35 Nm) of
torque to each screw. Do not overtighten the screws.
9. Remove the clear plastic cover protecting the terminal studs on the PDM faceplate.
10. Remove the nut and washers from each of the terminal studs.

Installing an MX2000 Router DC Power Distribution Module (240 V China)

WARNING:
To ensure that all power is off, locate the circuit breaker on the panel board that
services the DC circuit, switch the circuit breaker to the off position, and tape the
switch handle of the circuit breaker in the off position.
To install a DC power distribution module (PDM) in an MX2000 Router:
1. Ensure that the voltage across the DC power source cable leads is 0 V and that there is no chance that
the cable leads might become active during installation.
2. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
Before performing DC power procedures, disconnect all power sources.
372

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents