Replacing An Mx2020 Three-Phase Wye Ac Power Distribution Module; Removing An Mx2000 Three-Phase Wye Ac Power Distribution Module - Juniper MX2010 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

NOTE:
After a PDM is powered on, it can take up to 60 seconds for status indicators—such
as the LEDs on the PDM, the command output displays, and messages on the LED display
on the craft interface—to indicate that the PDM is functioning normally. Ignore error
indicators that appear during the first 60 seconds.
SEE ALSO
Removing an MX2000 Three-Phase Wye AC Power Cord | 583
Preventing Electrostatic Discharge Damage to an MX Series Router
MX2000 Three-Phase Wye AC Power Distribution Module Description | 102
RELATED DOCUMENTATION
Preventing Electrostatic Discharge Damage to an MX Series Router
MX2000 Three-Phase Wye AC Power Distribution Module Description | 102
MX2000 Three-Phase Delta and Wye AC Power Distribution Module LEDs | 107
Replacing an MX2010 Three-Phase Wye AC Power Distribution Module
Troubleshooting the MX2000 Router Power System | 320
MX2000 AC Power Cord Specifications | 170

Replacing an MX2020 Three-Phase Wye AC Power Distribution Module

Removing an MX2000 Three-Phase Wye AC Power Distribution Module | 590

1.
Installing an MX2000 Router Three-Phase Wye AC Power Distribution Module | 596
2.
Removing an MX2000 Three-Phase Wye AC Power Distribution Module
Before you remove a three-phase wye AC Power Distribution Module (PDM), be aware of the following:
590

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents