Powering On The Dc-Powered Mx2010 Router - Juniper MX2010 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

8. Observe the status LEDs on the PDM faceplate. If the PDM is correctly installed and functioning
normally, the LEDs light green steadily.
9. On each of the DC PSMs, move the switch to the on (|) position.

Powering On the DC-Powered MX2010 Router

To power on a DC-powered MX2010 router:
1. Verify that an external management device is connected to one of the Routing Engine ports on the
Control Board and Routing Engine (CB-RE) (AUX, CONSOLE, or MGMT).
2. Turn on power to the external management device.
3. Verify that the PDMs are fully inserted in the chassis.
4. Verify that the source power cables are connected to the appropriate terminal on the PDMs: the positive
(+) source cable to the return terminal labeled (RTN) and the negative (–) source cable to the input
terminal labeled (–48V).
5. Switch on the dedicated customer-site circuit breakers to provide power to the DC power cables.
Follow your site's procedures.
6. Check that the input labeled (–48V) LEDs are lit green steadily, indicating that the PDMs are installed
and functioning normally.
NOTE:
Nine input LEDs indicate proper voltage level and polarity of input feeds.
7. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
8. For each of the DC PDMs installed, move the DC circuit breaker at the power source to the (ON)
position.
9. On each of the DC PSMs, move the switch to the on (|) position.
315

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents