Installing The Mx2010 Extended Cable Manager; Installing The Mx2010 Extended Dc Cable Manager - Juniper MX2010 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

Installing the MX2010 Extended Cable Manager

To install the extended cable manager (see
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
2. Position the extended cable manager on the studs below the lower card cage.
3. Attach the extended cable manager using eight screws as shown in
4. Replace the cable manager cover, and secure it with the two captive screws.
Figure 180: Installing the Extended Lower Cable Manager

Installing the MX2010 Extended DC Cable Manager

To install the extended DC cable manager (see
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
2. Position the extended DC cable manager over the two slots located on both sides of the DC PDM.
Figure 180 on page
389):
Figure 181 on page
Figure 180 on page
389.
390):
389

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents