CHAPTER 9
Planning and Preparing the Site
IN THIS CHAPTER
MX2010 Rack Requirements | 135
MX2010 Router Transport Kit Moving Requirements and Guidelines | 138
MX2000 Router Grounding Specifications | 142
MX2010 Site Preparation Checklist | 145
Clearance Requirements for Airflow and Hardware Maintenance for the MX2010 Router | 147
Overview of Preparing the Site for the MX2010 Router
To prepare a site for router installation:
1. Verify that environmental factors such as temperature and humidity do not exceed router tolerances.
See:
MX2010 Router Environmental Specifications on page 141
2. Verify that the site and installation plan meets all safety guidelines and requirements. See:
General Safety Guidelines for Juniper Networks Devices
3. Locate sites for connection of system grounding. See:
MX2010 Router Grounding Specifications.
4. Calculate the power consumption and requirements.
Measure distance between external power sources and the router installation site. See:
125