Installing The Mounting Hardware; Installing The Mx2010 Mounting Hardware For A Four-Post Rack Or Cabinet; Installing Cage Nuts, If Needed - Juniper MX2010 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2010:
Table of Contents

Advertisement

CHAPTER 16

Installing the Mounting Hardware

IN THIS CHAPTER

Installing the MX2010 Mounting Hardware for a Four-Post Rack or Cabinet | 233

Installing the MX2010 Mounting Hardware for a Four-Post Rack or Cabinet

Installing Cage Nuts, If Needed | 233

1.
Installing the Four-Post Mounting Shelf | 235
2.
Removing the Center-Mounting Brackets | 237
3.
Installing Cage Nuts, If Needed
Insert cage nuts, if needed, into the holes listed in
distances are relative to the standard U division on the rack that is aligned with the bottom of the mounting
shelf.
To install cage nuts in a four-post rack:
1. On the rear side of both rack rails, insert cage nuts in the holes specified for the four-post mounting
shelf. Install the cage nuts in the front of the front rail (see
2. On the front side of both rack rails, insert cage nuts in the holes specified for mounting the chassis.
Install the cage nuts in the front of the front rail (see
Table 78: Mounting Hole Locations for Installing the Four-Post Mounting Shelf
Hole
Distance Above U Division
6
3.25 in. (8.3 cm)
5
2.63 in. (6.7 cm)
4
2.00 in. (5.1 cm)
Table 78 on page 233
and
Table 79 on page
Table 78 on page
Table 78 on page
233).
1.86 U
1.5 U
1.14 U
234. The hole
233).
233

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents