Suzuki XL7 2007 Service Manual page 1741

Jc636
Hide thumbs Also See for XL7 2007:
Table of Contents

Advertisement

13. Install the 3 fluid strainers (371), 1 fluid strainer
(372), and the 2 accumulator check valve
assemblies (353) into the middle control valve body
assembly.
14. Install the gasket (320) to the front control valve body
assembly (315).
15. Install the front control valve body spacer plate
(321).
16. Install the gasket (322).
NOTE
Align each bolt hole in the valve body with
the holes in the gaskets and spacer plate.
17. Install the spacer plate and gaskets on to the front
control valve body assembly (315).
NOTE
Align each bolt hole in the valve body with
the holes in the gaskets and spacer plate.
18. Install the front control valve body assembly (315)
onto the middle control valve body assembly (323).
Automatic Transmission:
19. Install 1 - M5 x 0.8 x 50 mm control valve body bolt
(304) into the front control valve body assembly and
hand tighten.
20. Install 4 or 5- M5 x 0.8 x 20 mm control valve body
bolts (313) into the front control valve body assembly
and hand tighten.
21. Install 2 - M5 x 0.8 x 16 mm control valve body bolts
(314) into the front control valve body assembly and
hand tighten.
CAUTION
!
Refer to "Fastener Notice: ".
22. Tighten all 16 control valve body assembly bolts,
evenly and gradually.
Tightening torque
Tighten the control valve body assembly bolts to
7 N⋅m (62 lb in).
5A-331

Advertisement

Table of Contents
loading

Table of Contents