MOTO GUZZI V100 E5 2023 Service Station Manual page 97

Table of Contents

Advertisement

V100 E5
If the tension is correct, tighten the lock
nut of the adjuster screw.
Otherwise, repeat the operations for
the belt tensioning.
When the correct belt tension frequen-
cy is reached, install the RH head sup-
port bracket.
Install the three fixing screws and tight-
en them to the specified torque.
Locking torques (N*m)
Head mounting bracket fixing screw
(36.88 ± 5.53 lb ft)
Fit the cover of the belt on alternator.
50 ± 7.5 Nm
Electrical system
ELE SYS - 97

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents