MOTO GUZZI V100 E5 2023 Service Station Manual page 285

Table of Contents

Advertisement

V100 E5
Remove the joints and collect the seal-
ing washers from each pipe.
DURING REFITTING, USE NEW SEALING WASHERS.
Remove the jig (1) for pipe positioning
from the ABS modulator.
Remove the lower fixing nut (2).
Remove the ground cable (3) from the
lower fixing of the modulator.
Braking system
BRAK SYS - 285

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents