MOTO GUZZI V100 E5 2023 Service Station Manual page 156

Table of Contents

Advertisement

Engine from vehicle
Vehicle preparation
CAUTION
TO CARRY OUT THE MAINTENANCE OPERATIONS AND IF THERE IS THE NEED TO RAISE THE
VEHICLE, USE A PANTOGRAPH LIFT PLACED IN CORRESPONDENCE WITH THE OIL SUMP.IN
ORDER TO AVOID DAMAGES, PLACE A PROTECTION BETWEEN THE OIL SUMP AND THE LIFT.
To remove the engine from the vehicle, first perform the following operations:
Place a pantograph jack under the engine and support the rear part of the vehicle with a
suitable stand or a workshop lift. Check the stability of the vehicle to prevent it from falling
and causing personal injuries.
Disconnect the battery and remove: the radiator, fuel tank, air filter housing, swingarm, car-
dan shaft, ECU.
Remove the clutch actuator and the rear shock absorber preload adjuster from the clutch
crankcase.
Removing the engine from the vehicle
Cut the tape fastening the engine wir-
ing harness to the frame.
NOTE
During refitting, you can use plastic clamps to secure the
wiring harness in position.
Pass the wiring harness under the
frame pipe.
ENG VE - 156
V100 E5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents