MOTO GUZZI V100 E5 2023 Service Station Manual page 337

Table of Contents

Advertisement

V100 E5
Remove the second lower screw fas-
tening the radiator. (The first fastens
the horn and has been removed previ-
ously.)
Open the metal clamp (3) and remove
the pipe that connects the radiator to
the expansion tank.
DURING REFITTING, USE A NEW CLAMP.
Open the spring clamp (4) and remove
the breather pipe from the radiator.
Loosen the metal clamp (5) and re-
move the left pipe from the radiator.
Cooling system
COOL SYS - 337

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents