Preparing The Site For Srx1400 Services Gateway Installation; Srx1400 Services Gateway Rack, Cabinet, And Airflow Clearance; Requirements - Juniper SRX1400 Hardware Manual

Services gateway
Hide thumbs Also See for SRX1400:
Table of Contents

Advertisement

CHAPTER 3
Preparing the Site for SRX1400 Services
Gateway Installation
Site Preparation Checklist for the SRX1400 Services Gateway
Copyright © 2011, Juniper Networks, Inc.
This chapter includes the following topics:
Site Preparation Checklist for the SRX1400 Services Gateway on page 41

SRX1400 Services Gateway Rack, Cabinet, and Airflow Clearance

Requirements on page 42
The checklist in Table 29 on page 41 summarizes the tasks you need to perform when
preparing a site for SRX1400 Services Gateway installation.
Table 29: Site Preparation Checklist
Item or Task
Verify that environmental
factors such as temperature
and humidity do not exceed
services gateway tolerances.
Select the type of rack or
cabinet.
Plan rack or cabinet location,
including required space
clearances.
If a rack is used, secure rack
to floor and building
structure.
For More Information ...
"SRX1400 Services Gateway
Environmental Specifications" on page 7
"SRX1400 Services Gateway Rack
Requirements" on page 43
"Clearance Requirements for Airflow and
Hardware Maintenance of the SRX1400
Services Gateway" on page 46
"SRX1400 Services Gateway Rack
Requirements" on page 43