2 Installation and commissioning
2.3.10 Installation of cooling fan for motors (option)
Continued
Separate cabling for axis 1 or 2
The figure below shows the cabling used for the fan on axis 1 or 2.
xx0700000669
A
B
C
Installation, separate fan cabling axis 1 or 2
The procedure below details how to install the separate cabling for the cooling fan
of axis 1 or 2.
1
2
Continues on next page
94
Cable bracket (to be removed)
Connector R1.SW2/3, connected to the robot base
Connector R3.FAN2, connected to the fan of axis 1 or 2.
Action
Move the robot to its calibration position.
DANGER
Turn off all:
•
electric power supply to the robot
•
hydraulic pressure supply to the robot
•
air pressure supply to the robot
Before entering the robot working area.
© Copyright 2007-2018 ABB. All rights reserved.
Note
This is detailed in section
chronization marks and synchron-
ization position for axes on
page
345.
Product manual - IRB 6660
3HAC028197-001 Revision: S
Syn-